https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&feed=atom&action=history
Internal contracting for energy-saving - Stuttgart - Revision history
2024-03-29T15:54:47Z
Revision history for this page on the wiki
MediaWiki 1.37.2
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4635&oldid=prev
Yannick Overzee at 08:00, 20 September 2022
2022-09-20T08:00:20Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 09:00, 20 September 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l41">Line 41:</td>
<td colspan="2" class="diff-lineno">Line 41:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><pdf>File:Stuttgart - DE.pdf</pdf></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><pdf>File:Stuttgart - DE.pdf</pdf></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>[[Category: <del style="font-weight: bold; text-decoration: none;">TOMORROW Factsheets</del>]]</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>[[Category: <ins style="font-weight: bold; text-decoration: none;">Innovative Governance Projects]]</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[[Category: Market/Business Projects</ins>]]</div></td></tr>
</table>
Yannick Overzee
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4565&oldid=prev
Aleksi Salmela at 07:15, 31 August 2022
2022-08-31T07:15:37Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 08:15, 31 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>[[File:Stuttgart factsheet picture.png|thumb|frame|Internal contracting allows the city of Stuttgart to fund energy-saving and efficiency projects for buildings owned by the city. It's part of Stuttgart’s Climate Protection Programme.]]</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>[[File:Stuttgart factsheet picture.png|thumb|frame|Internal contracting allows the city of Stuttgart to fund energy-saving and efficiency projects for buildings owned by the city. It's part of Stuttgart’s Climate Protection Programme. <ins style="font-weight: bold; text-decoration: none;">[https://www.thelocal.de/20171010/10-fascinating-things-you-probably-didnt-know-about-stuttgart Photo: Depositphotos/begepotam]</ins>]]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== Summary ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== Summary ==</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l34">Line 34:</td>
<td colspan="2" class="diff-lineno">Line 34:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.interreg-central.eu/Content.Node/Financing-energy-renovation-of-public-buildings.html Interreg Website]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.interreg-central.eu/Content.Node/Financing-energy-renovation-of-public-buildings.html Interreg Website]</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">== Photo Credit ==</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">[https://www.thelocal.de/20171010/10-fascinating-things-you-probably-didnt-know-about-stuttgart A view over Stuttgart. Photo: Depositphotos/begepotam]</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><pdf>File:Stuttgart - DE.pdf</pdf></ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category: TOMORROW Factsheets]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category: TOMORROW Factsheets]]</div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4506&oldid=prev
Aleksi Salmela at 11:22, 16 August 2022
2022-08-16T11:22:04Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 12:22, 16 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l42">Line 42:</td>
<td colspan="2" class="diff-lineno">Line 42:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[[Category: TOMORROW Factsheets]]</ins></div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4474&oldid=prev
Aleksi Salmela at 14:30, 11 August 2022
2022-08-11T14:30:30Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 15:30, 11 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l34">Line 34:</td>
<td colspan="2" class="diff-lineno">Line 34:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.interreg-central.eu/Content.Node/Financing-energy-renovation-of-public-buildings.html Interreg Website]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.interreg-central.eu/Content.Node/Financing-energy-renovation-of-public-buildings.html Interreg Website]</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== Photo Credit ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[https://www.thelocal.de/20171010/10-fascinating-things-you-probably-didnt-know-about-stuttgart A view over Stuttgart. Photo: Depositphotos/begepotam]</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4431&oldid=prev
Aleksi Salmela at 14:32, 9 August 2022
2022-08-09T14:32:06Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 15:32, 9 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l38">Line 38:</td>
<td colspan="2" class="diff-lineno">Line 38:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">[https://commons.wikimedia.org/wiki/File:Stuttgart.jpg Commons Wikimedia Stuttgart]</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4428&oldid=prev
Aleksi Salmela at 14:28, 9 August 2022
2022-08-09T14:28:49Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 15:28, 9 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>[[File:Stuttgart <del style="font-weight: bold; text-decoration: none;">2 small</del>.<del style="font-weight: bold; text-decoration: none;">jpeg</del>|thumb|frame|Internal contracting allows the city of Stuttgart to fund energy-saving and efficiency projects for buildings owned by the city<del style="font-weight: bold; text-decoration: none;">, and is </del>part of Stuttgart’s Climate Protection Programme.]]</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>[[File:Stuttgart <ins style="font-weight: bold; text-decoration: none;">factsheet picture</ins>.<ins style="font-weight: bold; text-decoration: none;">png</ins>|thumb|frame|Internal contracting allows the city of Stuttgart to fund energy-saving and efficiency projects for buildings owned by the city<ins style="font-weight: bold; text-decoration: none;">. It's </ins>part of Stuttgart’s Climate Protection Programme.]]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== Summary ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== Summary ==</div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4425&oldid=prev
Aleksi Salmela at 14:20, 9 August 2022
2022-08-09T14:20:38Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 15:20, 9 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l5">Line 5:</td>
<td colspan="2" class="diff-lineno">Line 5:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Stuttgart has successfully implemented an instrument to improve the energy performance of its municipal building stock, and significantly reduce its CO2 emissions: internal contracting, or “Intracting”. Internal contracting allows the city to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme. The internal contracting is funded through a revolving fund, which is a stable fund that operates without any fiscal year limitation: it is replenished by repaying money used from the account. As a result, no interest or banking fees have to be paid for these investments, and projects can be started faster. In this case, the money used for the replenishment were the savings made thanks to the renovations. Between 1995 and 2013, the fund’s worth increased from € 9,5 million euros, to € 11,8 million euros. It is estimated that the programme resulted in a total of 18 million euros of energy costs saved, within the time frame of 1995-2013 only.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Stuttgart has successfully implemented an instrument to improve the energy performance of its municipal building stock, and significantly reduce its CO2 emissions: internal contracting, or “Intracting”. Internal contracting allows the city to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme. The internal contracting is funded through a revolving fund, which is a stable fund that operates without any fiscal year limitation: it is replenished by repaying money used from the account. As a result, no interest or banking fees have to be paid for these investments, and projects can be started faster. In this case, the money used for the replenishment were the savings made thanks to the renovations. Between 1995 and 2013, the fund’s worth increased from € 9,5 million euros, to € 11,8 million euros. It is estimated that the programme resulted in a total of 18 million euros of energy costs saved, within the time frame of 1995-2013 only.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>The Energy Department, which falls under the Office for Environmental Protection, manages this fund and finances energy efficiency projects, which otherwise would have to be contracted externally. From investing in saving energy, to the actual costs that are saved through reduced energy consumption, all these financial flows remain within municipal control. Examples of how internal contracts were implemented range from lighting controls to buildings a new heat and power plant for a public swimming pool. A key element for internal contracting is a well-coordinated administrative process, well-defined roles, responsibilities and communication between the parties involved. The example of Stuttgart is used as a pilot model for Internal Contracting. As part of the EU funded “Infinite Solutions” project, the Stuttgart model has been implemented in several cities: Udine (Italy), Águeda (Portugal), Koprivnica (Croatia), and Almada (Portugal).</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== Goals ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Retrofit and renovate public buildings.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Implement improvement of energy performance through internal contracting.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Initiate awareness-raising activities.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== How it works ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The Energy Department, which falls under the Office for Environmental Protection, manages this fund and finances energy efficiency projects, which otherwise would have to be contracted externally. From investing in saving energy, to the actual costs that are saved through reduced energy consumption, all these financial flows remain within municipal control. <ins style="font-weight: bold; text-decoration: none;">The main step of the process are the following:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* To determine what properties were suited for internal contracting, the energy department performed data analyses and energy audits, and monitors what construction or renovation plans are set out for public buildings. As such, it has an integral vision on the management and energy efficiency of public buildings.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The energy department then calculates costs with the construction department and contracts the facility department, which owns the housing stock, to have the construction department implement the renovations or energy saving project.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Finally, the facility department pays back the investment to the energy department’s revolving fund.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Examples of how internal contracts were implemented range from lighting controls to buildings a new heat and power plant for a public swimming pool. A key element for internal contracting is a well-coordinated administrative process, well-defined roles, responsibilities and communication between the parties involved. </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== Transformative potential ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The example of Stuttgart is used as a pilot model for Internal Contracting. As part of the EU funded “Infinite Solutions” project, the Stuttgart model has been implemented in several cities: Udine (Italy), Águeda (Portugal), Koprivnica (Croatia), and Almada (Portugal). <ins style="font-weight: bold; text-decoration: none;">The details on this replication are available in the publication [https://energy-cities.eu/wp-content/uploads/2019/01/PUBLI_infinite_solutions_guidebook_softloans_2017_en.pdf “Infinite Solutions Guidebook - Financing the energy renovation of public buildings through internal contracting”].</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== More information ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[https://energy-cities.eu/wp-content/uploads/2018/11/Stuttgart_Intracting_2017_en.pdf Energy Cities Case Study]</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[https://www.interreg-central.eu/Content.Node/Financing-energy-renovation-of-public-buildings.html Interreg Website]</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>== References ==</div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4421&oldid=prev
Aleksi Salmela at 09:43, 9 August 2022
2022-08-09T09:43:52Z
<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 10:43, 9 August 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[[File:Stuttgart 2 small.jpeg|thumb|frame|Internal contracting allows the city of Stuttgart to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme.]]</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== Summary ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Stuttgart has successfully implemented an instrument to improve the energy performance of its municipal building stock, and significantly reduce its CO2 emissions: internal contracting, or “Intracting”. Internal contracting allows the city to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme. The internal contracting is funded through a revolving fund, which is a stable fund that operates without any fiscal year limitation: it is replenished by repaying money used from the account. As a result, no interest or banking fees have to be paid for these investments, and projects can be started faster. In this case, the money used for the replenishment were the savings made thanks to the renovations. Between 1995 and 2013, the fund’s worth increased from € 9,5 million euros, to € 11,8 million euros. It is estimated that the programme resulted in a total of 18 million euros of energy costs saved, within the time frame of 1995-2013 only.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Stuttgart has successfully implemented an instrument to improve the energy performance of its municipal building stock, and significantly reduce its CO2 emissions: internal contracting, or “Intracting”. Internal contracting allows the city to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme. The internal contracting is funded through a revolving fund, which is a stable fund that operates without any fiscal year limitation: it is replenished by repaying money used from the account. As a result, no interest or banking fees have to be paid for these investments, and projects can be started faster. In this case, the money used for the replenishment were the savings made thanks to the renovations. Between 1995 and 2013, the fund’s worth increased from € 9,5 million euros, to € 11,8 million euros. It is estimated that the programme resulted in a total of 18 million euros of energy costs saved, within the time frame of 1995-2013 only.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The Energy Department, which falls under the Office for Environmental Protection, manages this fund and finances energy efficiency projects, which otherwise would have to be contracted externally. From investing in saving energy, to the actual costs that are saved through reduced energy consumption, all these financial flows remain within municipal control. Examples of how internal contracts were implemented range from lighting controls to buildings a new heat and power plant for a public swimming pool. A key element for internal contracting is a well-coordinated administrative process, well-defined roles, responsibilities and communication between the parties involved. The example of Stuttgart is used as a pilot model for Internal Contracting. As part of the EU funded “Infinite Solutions” project, the Stuttgart model has been implemented in several cities: Udine (Italy), Águeda (Portugal), Koprivnica (Croatia), and Almada (Portugal).</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The Energy Department, which falls under the Office for Environmental Protection, manages this fund and finances energy efficiency projects, which otherwise would have to be contracted externally. From investing in saving energy, to the actual costs that are saved through reduced energy consumption, all these financial flows remain within municipal control. Examples of how internal contracts were implemented range from lighting controls to buildings a new heat and power plant for a public swimming pool. A key element for internal contracting is a well-coordinated administrative process, well-defined roles, responsibilities and communication between the parties involved. The example of Stuttgart is used as a pilot model for Internal Contracting. As part of the EU funded “Infinite Solutions” project, the Stuttgart model has been implemented in several cities: Udine (Italy), Águeda (Portugal), Koprivnica (Croatia), and Almada (Portugal).</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">== References ==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[https://www.citiesoftomorrow.eu/resources/toolbox/factsheets/internal-contracting-energy-saving-stuttgart Cities of Tomorrow Internal contracting for energy-saving Stuttgart]</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">[https://commons.wikimedia.org/wiki/File:Stuttgart.jpg Commons Wikimedia Stuttgart]</ins></div></td></tr>
</table>
Aleksi Salmela
https://wiki.sustainablejustcities.eu/index.php?title=Internal_contracting_for_energy-saving_-_Stuttgart&diff=4409&oldid=prev
Aleksi Salmela: I copy pasted information from the TOMORROW Fact sheet on Stuttgart. Will edit more later.
2022-08-08T14:43:53Z
<p>I copy pasted information from the TOMORROW Fact sheet on Stuttgart. Will edit more later.</p>
<p><b>New page</b></p><div>Stuttgart has successfully implemented an instrument to improve the energy performance of its municipal building stock, and significantly reduce its CO2 emissions: internal contracting, or “Intracting”. Internal contracting allows the city to fund energy-saving and efficiency projects for buildings owned by the city, and is part of Stuttgart’s Climate Protection Programme. The internal contracting is funded through a revolving fund, which is a stable fund that operates without any fiscal year limitation: it is replenished by repaying money used from the account. As a result, no interest or banking fees have to be paid for these investments, and projects can be started faster. In this case, the money used for the replenishment were the savings made thanks to the renovations. Between 1995 and 2013, the fund’s worth increased from € 9,5 million euros, to € 11,8 million euros. It is estimated that the programme resulted in a total of 18 million euros of energy costs saved, within the time frame of 1995-2013 only.<br />
<br />
The Energy Department, which falls under the Office for Environmental Protection, manages this fund and finances energy efficiency projects, which otherwise would have to be contracted externally. From investing in saving energy, to the actual costs that are saved through reduced energy consumption, all these financial flows remain within municipal control. Examples of how internal contracts were implemented range from lighting controls to buildings a new heat and power plant for a public swimming pool. A key element for internal contracting is a well-coordinated administrative process, well-defined roles, responsibilities and communication between the parties involved. The example of Stuttgart is used as a pilot model for Internal Contracting. As part of the EU funded “Infinite Solutions” project, the Stuttgart model has been implemented in several cities: Udine (Italy), Águeda (Portugal), Koprivnica (Croatia), and Almada (Portugal).</div>
Aleksi Salmela